OVERVIEW
How a cable route is laid
450+ kilometres of HT cable laid across seven states — follow a route from trench to a tested, commissioned line.
Trenching
Excavation, sand bedding and cable trench preparation with route marking and protective tiles.
0KV
Distribution
Underground HT distribution feeders
0KV
Sub-transmission
Feeders between grid substations
0KV
Transmission
High-voltage underground links
Jointing, testing & commissioning
Delivered by certified jointers and QC engineers.
- Straight-through joints
- Terminations
- HV testing
- Earthing
Scope of Work
Full underground cabling capability
From trench to a jointed, tested and commissioned HT cable network.
- Trenching & backfill
- Cable ducts & trays
- HV / pressure testing
- Cable route markers
- Sand bedding & protective tiles
- Straight-through jointing
- Earthing systems
- GPS route mapping
- HT cable laying (11/33/66 KV)
- Termination jointing
- RMU & substation connections
- Commissioning
PROJECTS IN THIS SECTOR
Multi-state underground cabling
FEATURED
11/33/66 KV cabling for state utilities
Underground HT cable laying, jointing and commissioning for discoms across seven states.
450 km
Cable laid
Up to 66 KV
Voltage class
Delivered across seven states
Andhra Pradesh
Goa
Kerala
Odisha
Rajasthan
Uttar Pradesh
West Bengal
Where we've delivered
Cable project footprint
Underground HT cable laying for state electricity utilities across seven states.
Rajasthan — JVVNL & JDVVNL
Odisha — CESU · Uttar Pradesh — MVVNL
Goa, Kerala, Andhra Pradesh & West Bengal
Electrical Clients
Trusted by state utilities & discoms
Planning an underground cable project?
Talk to our team about voltage class, jointing, testing and commissioning.